The 480-metre Sabarmati River bridge in Ahmedabad has been completed. It is part of the Mumbai-Ahmedabad High-Speed Rail (MAHSR) corridor, which is the bullet train route between the two cities. With this, 18 of the 21 bridges in Gujarat are now ready. The bridge is located between the Sabarmati and Ahmedabad bullet train stations in Ahmedabad. The table below gives the main details of the bridge. Quick Facts Details Project Mumbai-Ahmedabad High-Speed Rail (MAHSR) corridor Structure Sabarmati R...
1 min read