The Walk 2, Gomti Nagar Extension: Buyer Guide to the 21 Shops

What the UP-RERA, LDA and fire department records say about The Walk 2, the 21-shop Commercial-03 building by Shalimar Lakecity in Shalimar OneWorld, and what a shop buyer still has to ask.

The Walk 2, Gomti Nagar Extension: Buyer Guide to the 21 Shops
The Walk 2, Gomti Nagar Extension: Buyer Guide to the 21 Shops

What the UP-RERA, LDA and fire department records say about The Walk 2, the 21-shop Commercial-03 building by Shalimar Lakecity in Shalimar OneWorld, and what a shop buyer still has to ask.

Quick answer: The Walk 2 is a three-floor, shops-only building by Shalimar Lakecity Private Limited on Commercial-03 inside Shalimar OneWorld, Gomti Nagar Extension, registered with UP-RERA as UPRERAPRJ438254/10/2026. The RERA data lists 21 shops of 653–1,519 sq ft carpet area and a declared completion of 20 December 2026. Prices are on request.

The full fact sheet is on the The Walk 2 project page. This guide covers what the records say about this one building, what is still unconfirmed, and what to ask before you pay a token. If you are also looking at the sister building, the The Walk 1 vs The Walk 2 comparison covers the differences.

Project at a glance

ItemWhat the records say
PromoterShalimar Lakecity Pvt Ltd (formerly ANS Developers Pvt Ltd)
LandPart of khasra 365P (Ka and Kha), 377, 378, 379 and 380P (Ka and Kha), Village Baghamau
RERAUPRERAPRJ438254/10/2026
AuthorityLucknow Development Authority (LDA)
Plot area1,986.74 sq m across five khasra parts
Units21 shops, carpet 653–1,519 sq ft
Proposed start / declared completion25 October 2022 / 20 December 2026
Declared project cost₹2,050 lakh (about ₹20.5 Cr)

Unit sizes, plot area, cost and documents come from the UP-RERA data shown on ReraTracker. Dates and development works come from the RERA declaration in Brickly's database.

Where Commercial-03 sits

On LDA's papers the building is "Commercial-03" in the revised layout of the integrated township at Baghamau village. The 2026 LDA sanction letter gives the landmark as "Shaheed Path One World". ReraTracker places it at 26.823942, 81.020681; open those coordinates in a map app before a site visit so you stand at the right block.

The promoter's declaration describes one arch-shaped plot abutting a 12 m internal road on the north, with one entrance and one exit. Other plots sit to its east and west, and a green area and lake lie between "both plots". The khasra-wise split on ReraTracker shows khasra 377 is the largest piece at 1,043.60 sq m, while the 380 part is only 21.62 sq m. Pros and cons of the lake-facing layout are covered in lake-side and boulevard retail inside a township.

The 21 shops, floor by floor

FloorShopsCarpet rangeTotal carpet
Ground7960–1,121 sq ft7,587 sq ft
First7839–1,519 sq ft6,897 sq ft
Second7653–1,500 sq ft5,941 sq ft

Ground-floor shops cluster tightly around 1,070–1,121 sq ft, with one 960 sq ft unit. The first floor has five units of about 840 sq ft and two large ones. The second floor has the smallest shops, four of them around 653–658 sq ft. Total carpet is 20,425 sq ft, averaging about 973 sq ft per shop.

These are all carpet figures. If a quote uses super or built-up area, read carpet vs super area for shops before comparing rates.

An old start date and a near completion date

This is not a fresh launch. The paper trail on UP-RERA runs like this:

  • 22 October 2022: LDA permit Commercial Building/06236/LDA/BP/21-22/3018/23092022 for Commercial-03, valid to 21 October 2027.
  • 25 October 2022: declared start of the project.
  • 17 February 2026: a second LDA "Sanction Letter (Compounded)", permit Commercial Building/18320/LDA/BP/COMP/25-26/4166/17022026, issued under the compounding bye-laws. It grants permission of the "built structure as per compounded building plan".
  • 5 and 8 June 2026: fire officer inspection, then a fire safety certificate (completion NOC) issued, valid to 7 June 2031.
  • 20 December 2026: declared completion.

Read together, the building appears to be largely built, and part of it needed compounding (regularisation of deviations from the earlier map). Ask Shalimar exactly what was compounded and whether any shop you are offered changed in size. The approval documents to check, in order, are in our commercial shop booking checklist.

Services declared

  • Power: 11 kV supply assumed from the state board, a 630 KVA compact substation at the rear, and a 500 KVA DG set for backup.
  • Water: 20 KLD potable supply from a municipal connection or borewell.
  • Sewage: connected to the township's centralised 2,250 KLD MBBR STP, not a building STP.
  • Fire: the certificate lists one block, three floors, one basement and a height of 12.61 m, in the Mercantile occupancy class.
  • Parks, community building: marked NA.

ReraTracker's summary shows zero parking, yet the fire certificate mentions a basement and the compounded drawings label it "basement for parking". Ask how many car spaces are sanctioned and whether any are sold separately.

Paying safely

ReraTracker lists three State Bank of India accounts at the Commercial Branch, Gokhale Marg, named for The Walk 2: collection, separate and transaction. The proforma agreement for sale names the collection account as the one for buyer payments. Pay only by cheque or bank transfer into that account, never in cash, and get a receipt on the promoter's letterhead. How much can be taken before a registered agreement is explained in payment plans and RERA section 13.

What is not known yet

  • Price and payment plan: price on request. Schedule C (payment plan) in the proforma agreement is blank.
  • Completion or occupancy certificate: not in the uploaded documents list on ReraTracker as of 13 November 2026.
  • RERA registration date: ReraTracker shows "RERA Received 25-10-2022", which matches the proposed start, not a registration date. Check the certificate on UP-RERA.
  • Availability: how many of the 21 shops are unsold is not public.

Questions to ask Shalimar

  1. "Which shop number, floor and carpet area is on offer, and is it the same as in the compounded plan?"
  2. "Please give a written cost sheet on carpet area with GST, PLC, parking and maintenance shown separately."
  3. "When will you apply for the LDA completion cum occupancy certificate?"
  4. "How many basement parking spaces are sanctioned, and how are they allotted?"
  5. "What loan or charge, if any, is shown in the encumbrance details and Form RA-8?"

For the full price build-up, use the commercial shop cost sheet guide. More listings are on projects in Lucknow.

Sources

  • Brickly India project data (UP-RERA declaration): https://bricklyindia.com/projects/the-walk-2-lucknow
  • ReraTracker, The Walk 2 (units, khasra areas, cost, permits, documents, bank accounts): https://reratracker.com/the-walk-2-in-lucknow-by-m-s-shalimar-lakecity-private-limited-formerly-m-s-ans-developers-private-limited-rtid6225
  • LDA sanction letters, 22 October 2022 and 17 February 2026 (UP-RERA upload): https://up-rera.in/ViewDocument?Param=SanctionedLetter-2142814_23092026061537465_The%20Walk%202_Sanction%20Letter.pdf
  • UP Fire and Emergency Services fire safety certificate, 8 June 2026 (UP-RERA upload): https://up-rera.in/ViewDocument?Param=PRJ2142814_01092026113306571_FIRE_NOC_COMM-03.pdf
  • Proforma agreement for sale, The Walk 2 (UP-RERA upload): https://up-rera.in/ViewDocument?Param=PRJ2142814_01092026112850063_ATS_The_Walk_2_revised.pdf
  • UP-RERA portal: https://www.up-rera.in

Frequently asked questions

What is the RERA number of The Walk 2?

UPRERAPRJ438254/10/2026. Look it up yourself on the UP-RERA portal before paying any money.

How many shops are in The Walk 2 and what sizes?

The UP-RERA unit data shown on ReraTracker lists 21 shops, seven each on the ground, first and second floors, with carpet areas from 653 sq ft to 1,519 sq ft.

When will The Walk 2 be completed?

The declared completion date is 20 December 2026. A fire safety (completion) certificate was issued on 8 June 2026, but no completion or occupancy certificate from LDA appears in the uploaded documents list. Ask for it.

What is the price of a shop in The Walk 2?

Prices are on request. No rate is published in the RERA data or on Brickly, so ask for a written cost sheet on carpet area.

Who is building The Walk 2?

Shalimar Lakecity Private Limited, formerly ANS Developers Private Limited. The RERA data names KRA Projects Private Limited as contractor.